1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
35.00 LPA TO 45.00 LPA
Position: GM – Production
Location: Manesar - Gurugram.
Experience: 18 - 25 Years
Industries: Packaging
Responsibilities:
Strategic & Operational Leadership
Lead and manage end-to-end production operations across all manufacturing units.
Develop and execute production strategies aligned with organizational goals.
Ensure minimum 90%+ OTIF (On Time In Full) delivery performance.
Drive capacity planning and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
30.00 LPA TO 40.00 LPA
Position: Production Head
Location: Mundra near by Kutch
Experience: 15 - 20 Years
Industries: Chemical - MNC
Responsibilities:
Adherence to Production planning and Scheduling - Issue Instruction to Shift incharge for executing , Co-rdinate with stores dept fro R.M / PM and despatch for Repacking /Relabelling activity.
After ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Position: Production Manager
Location: Vapi
Experience: 12 - 15 Years
Industries: Pharma - API
Responsibilities.
Overall responsible for planning and maintenance of optimum inventory of raw materials, in –process and finished goods.
To ensure the products are manufactured and stored according to pre-approved instructions to ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 4.00 LPA
Position: Production Chemist
Location: Mehsana
Experience: 2 - 3 Years
Industries: Pharma - API
Responsibilities:
Report to the Production Manager on daily production activities and progress.
Ensure adherence to Standard Operating Procedures (SOPs) for cleaning and equipment operations.
Comply with Batch Manufacturing Record (BMR) specifications and promptly report ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
3.00 LPA TO 3.50 LPA
Position: Jr. Engineer - Production
Location: Daman
Experience: 1 - 2 Years
Industries: Engineering
Responsibilities:
Assist in day-to-day assembly operations as per drawings, SOPs, and production schedules to ensure timely output.
Support senior engineers in troubleshooting assembly issues, maintaining quality standards, and reducing rework or defects.
Ensure proper use ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
Position : Production Engineer
Location : Daman
Experience: 5 - 8 Years
Industries: Engineering
Responsibilities:
Plan and monitor daily production schedules to meet delivery targets.
Supervise manufacturing processes to ensure smooth and timely operations.
Identify and fix production issues to reduce downtime.
Ensure product quality and compliance with industry standards and safety ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 3.50 LPA
Position: Production Engineer
Location: Silvassa
Experience: 2 - 3 Years
Industries: Engineering
Responsibilities:
To ensure all operations are carried out as per Process parameter / Production plan.
To ensure strict compliance to the process control parameters.
To stop and correct the processes / instruct the workers ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 4.00 LPA
Position: Shift Engineer - Production
Location: Silvassa
Experience: 1 - 3 Years
Industries: Engineering
Responsibilities
Oversee and manage all production activities during the assigned shift to ensure smooth and continuous operations.
Monitor conductor manufacturing processes such as wire drawing, stranding, bunching, and annealing to meet ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 6.00 LPA
Position: Production Engineer
Location: Bhilad
Experience: 5 - 6 Years
Industries: Engineering
Responsibilities
To ensure all operations are carried out as per Process parameter / Production plan.
To do the patrolling inspection and process control on shop floor.
To organize and implement daily production activity on shop ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
4.00 LPA TO 4.20 LPA
Position: Sr. Executive - Production
Location: Vapi
Experience: 5 - 6 Years
Industries: Plastics
Responsibilities:
Analyze Plan vs Actual Production and conduct gap analysis to identify variances.
Schedule and reschedule machines and equipment to optimize production flow.
Ensure line clearance before production start-up and after batch completion.
Plan resources efficiently, including manpower, ...